Monday, January 16, 2012

2011 in review - a few weeks late

This is my major project for 2011 - followed by all the projects that came up after I started it - which explain why I just finished it in January - that and the fact that I feared, no expected, that it wasn't quite coming out as well as I hoped, and unfortunately I was right.
Knit of a super fine cashmere70/silk30 (Superior by Filatura de cross) paired with a strand of fine merino, it's called "Sounds of Silence" in a pattern book called Duettes, and it's soft as a cloud. I thought it would be almost a summer sweater because it is so light, but it's very warm.
The problem is the low wide neck, and the shawl collar is too short in the back (knit according to the pattern, which didn't show the back in the picture) so it doesn't lie right. If I'd had more yarn, I would have made the collar longer down the back and I think that would have made the front lie better too.

I was inspired by some beaded wristlets I saw a friend wearing at a meeting last January and decided that would be my Christmas gift project for the year. I started in the summer and made at five pairs - including one I customized for Emily with curly W's for the Washington Nationals - my first venture into charting an original design. I experimented with various sizes and kinds of beads. The only hard part is stringing 1080 beads onto the yarn before starting - the smaller the bead the harder it is, because you have to use a beading needle instead of a fine crochet hook.









I started the year with a blue Malibrigo worsted scarf and hat for myself, after I finished the orange set for Emily's birthday. The pattern was from Interweave - Rivulet, I think, and I found a compatible pattern for a slouch hat on Ravelry. (The new kitten - Nemesis - is a great aid to knitting and photography)









Along the way I began (and after interruptions) finished an Estonian lace shawl, of a nice rose colored silk, merino, and alpaca blend. I was very dubious about how it was turning our until I blocked it - yes really blocked with pins and water etc, for the first time in my life. It was knit from the middle to the end with a provisional cast on and then picked up there for the other half.



Once I discovered beading, I used another color of the same silk/alpaco blend and made a purple scarf. This beading was easier because the beads were put on the yarn over loops with a crochet hook and knit in one at a time as the work progressed, instead of having to be strung first.



My final interruption was to knit up the interesting yarn I found in Portland, Maine, on vacation in August - Berroco's Boboli. I finished that vest ("Dodgson")on Columbus day weekend at the beach when John got sick. It was quick and easy - but a nice weight and texture in a reverse stockinette, with wide ribbing around the collar and front.

And then the scramble to finish the wristlets for Christmas. Maybe next year I'll clean the beads from last summer's road trip out of the car where they still jingle in the passenger side door pocket.

So that's why it took me a year to knit the ruffled and cabled grey cardigan. [I hope the blog fairy can rearrange the pictures to go with the text - I haven't figured it out.] Maybe I'll even round up the lables and patterns and post on Ravelry and figure out how to insert the hyperlinks.

I wish you all a happy New Year, knitting your yarn and futures!

Saturday, January 7, 2012

under them skies of blue

First things first: I arrived at work this morning to see that the fence surrounding my office's parking lot had been yarn bombed! It's hard to see in my photo, but someone has tied scarves to all of the posts of the fence along one city block. Needless to say, I was absolutely delighted. Perhaps it's the work of the knitty gritty committee, or of the person who works in my building and has a license plate cover that says "I'd rather be knitting." Either way, I'm hoping it lasts for a little while because it will make me happy whenever I pull into the parking lot.

Holiday knitting was a dreadful fail this year, even though I wildly scaled back my plans for it. The only thing I finished (sewed in the ends and steam blocked it mere hours before boarding a plane to return from vacation) was this sweater for a little girl who loves "hop hops". I'm hoping her love will continue until she grows into it since it is quite ample now.

Getting a picture of her was very difficult, so most of my pictures look like this.

(Since she is actually quite cute even when she is not in handknits, those of you who know my family may want to check out these pictures of her birthday celebration.) My fair isle still has a ways to go, but at least the bunnies are recognizable as bunnies. Thanks to Wamps for suggesting this pattern!

I used Spud & Chloe sweater, which knit at a much larger gauge than the pattern required. So I knit the stitch counts for the 6 month size, but used the lengths for the 2-to-4 year old size, which worked out well proportionately. I only had time to steam block before gifting, but plan to wet block it when I'm next at home. Since it's unlikely that she'll grow into it before then, I think that it's a safe plan.

Hope you've all had good starts to 2012 and that your holiday knitting was more successful than mine!

Sunday, December 4, 2011

you act like you're hip to their tricks

I actually finished the knitting of this gift in time for the recipient's birthday, but then it languished as I thought that I had messed up the grafting. After deciding that it had to be finished over Thanksgiving, I realized that I had just pulled the grafting too tight, so it was actually fine after being loosened. (Apologies for everything that I said about the Knitty grafting garter stitch tutorial before that realization.)

Two attempts at weaving in the ends and I finally had a finished product that I liked well enough to gift.

It's the Millwater eternity cowl, made out of Plucky Knitter Primo Worsted in Dandy Lion colorway. I love this color and wish that it were one that I could wear. But gifting it is second best. Rav details here.
(wrapped double)

I am actually working on another gift that uses Dandy Lion in Primo fingering so I've had the chance to enjoy this color a little longer.

And now in a color I can wear, the Narragansett sweater in Primo Worsted Narragansett Gray.
I've yet to get a good picture of this one, but it is wonderfully soft to wear, even if it does fall off my shoulders all the time. I loved knitting this pattern, despite its long hiatus due to the summer heat, and expect that I will enjoy wearing it as well. I made the sleeves full length, although I'm not entirely sure that they shouldn't be three-quarters length for proportion's-sake, and I left off the hip detail. Rav details here.

And, finally, because handknits-in-action always make me happy: an action shot of that cardigan where it fits much better and where you get to see MRB's newly-discovered fish face.
Hope you all had lovely Thanksgivings!

Friday, November 11, 2011

Ain't Got No Silver

What to do when you run out of yarn and aren't sure if more exists in the world?

Adam's Point Hoodie

I started knitting this version of Ysolda's Peaks Island Hoodie at the beginning of October and am about halfway through the hood decreases (meaning, maybe three quarters of the way done), and I am TOTALLY out of yarn.

I used two skeins of Plucky MCN in finger, held double, and got gauge pretty well with size 9 needles, and while I thought that the combination of my generally tight knitting + two skeins of yarn would get me through, but clearly no.  Sigh.

So I posted to Ravelry asking for yarn, but I think the best may be to either find a colorway that is pretty close OR a colorway that is totally different.  Neither option appeals.  I could also rip it out, but there's really nothing I hate more.

Sunday, October 30, 2011

'cause in the winter weather, I'll lend you my warmest sweater

When this is the view from my window (on October 30, no less), is it any wonder that I've made quite a bit of progress on a sweater long abandoned through a sticky-summer-without-air-conditioning? It's been like an extra blanket while I knit it.
Luckily, I have quite a few other things that I should be knitting which should serve the same purpose, once I get this one out of my system.

Sunday, October 23, 2011

A little this and that

First up, some knitting that has been sitting around, waiting for me to mail it to its future owners.


     
Baby hats!


And the silliest socks ever. (Yoga socks, missing the heal and the toe.)  Apologies for the flashy picture.


And finally, a proud moment for me, the quilt top is done!  I still need to make a back (I am tempted to just go and buy an appropriately sized single length of fabric.  Actually, I may just do that....), and then do the sandwiching and the quilting and the binding, but I feel more confident that this will be done before its intended baby grows up entirely.  I am less confident I will start and finish the other quilt I want to make before that baby is born, but we'll see.

Wednesday, October 12, 2011

the streetlights, not the stars, now

Let this serve as a warning to any parents planning on "productive quiet time" for their overactive child:

11-year-old girl: The worst part about my week was yesterday when I had to sit in my bed all day and knit! Just knit. Or read. Knit or read. But just sit in my bed and only knit or read!

HEB: Hey, hey, hey: knitting isn't bad. Why would that be the worst part of your week?

11yog: Knitting is torture! When all you can do is knit and the whole house is silent, it's the worst thing in the world!